White Acrylic Square Shower Bath Front Panel - 1500mm
White Acrylic Square Shower Bath Front Panel - 1600mm
White Acrylic Square Shower Bath Front Panel - 1600mm

White Acrylic Square Shower Bath Front Panel - 1600mm

Regular price £170.00 Sale price £84.99
/
Spend & Save: Save 5% when you spend £500, or 10% when you spend £1,000. Automatically applied at checkout. More information
  • Delivery - £29
  • Available to order, dispatches when back in stock. Contact us for an estimated delivery date.
  • Available to pre-order - dispatches once back in stock
  • Inventory on the way

Description

Add the perfect finishing touch to your square shower bath with this White Acrylic Square Shower Bath Front Panel. Crafted from gloss white acrylic, this panel offers a sleek, modern look that complements a variety of bathroom styles. Available in 1500mm, 1600mm, 1700mm, and 1800mm widths, it is designed for use with square shower baths, ensuring a seamless fit for your space.

The high-quality acrylic material is both durable and easy to maintain, providing a smooth and shiny surface that will last for years to come. A matching 700mm end panel is also available to complete the set, providing a cohesive and stylish appearance for your bath installation.

  • Available in four sizes: 1500mm, 1600mm, 1700mm, and 1800mm to suit different bath configurations.
  • Gloss white acrylic – A sleek, high-gloss finish for a clean, contemporary look.
  • Perfect for square shower baths – Tailored to fit with square-shaped bath designs for a precise and polished installation.
  • Matching 700mm end panel available – For a complete and coordinated bath installation.

This White Acrylic Square Shower Bath Front Panel is the ideal choice for creating a neat, polished, and modern showering area in your bathroom.

Specification

Product code WBS303
Brand Bath Lab
Style Contemporary
Material Acrylic
Colour European White
Length mm
Width 1600.0 mm
Depth 167.0 mm
Height 500.0 mm
Weight 3.6 kg
Entrance Width mm
Door Swing In mm
Door Swing Out mm
Radius mm
Number Of Tap Holes
Inner Bowl Height mm
Maximum Radiator Projection mm
Volume l
Displaced Capacity l
Bowl Shape
BTU at 30 Degrees Celsius BTU
BTU at 50 Degrees Celsius BTU
BTU at 60 Degrees Celsius BTU
Heating Element Wattage W
Number of Bowls
Seat Type
Tap Holes Required
Adjustment
Guarantee 5 Years

Dimensions

Free delivery on orders over £299

This product is classed as a large delivery item and the following delivery options are available:

Delivery Service Timescale Cost
Delivery ASAP Usually delivered in 1-2 working days £29 (free if order over £299)
Delivery When You Are Ready We will email you to arrange a delivery date with you £29 (free if order over £299)

If your order consists of large and small products, you will only pay the large item delivery fee

When will delivery be?
Deliveries are Monday - Friday between 8am - 6pm. and you will kept updated on delivery by email, phone or text so you know when delivery will be.

Can I delay delivery?
Yes, please place you order and email us the order number and details of when you would like delivery to be.

Can I order something that is out of stock?
Yes, you can back-order an item to be delivered once available. If you order other in-stock items we will delay delivery until all items are available but can arrange a split delivery if required (which may incur charges).

Can I change my order once placed?
Yes, provided your order has not been dispatched, it can be changed.

Where do you deliver to?
We deliver to the majority of mainland UK. We do not deliver to Ireland, Northern Ireland, the Scottish Isles & Highlands or the Channel Isles at present.

See our delivery page for more information

  • We offer a no-quibble 30 day returns policy (from delivery) for refunds and exchanges.
  • We also offer a convenient collection service for unwanted products. This is chargeable but is useful for large, fragile items.
  • To arrange a return, please contact us first to start the process.
  • We cannot accept returns for products that have been used, installed or are not as new.
  • In the unlikely event that an item arrives damaged, we will arrange a replacement or refund.
  • Damaged items must be reported to us within 48 hours of delivery.

See our returns page for more information

Still have questions?

We're here to help with bathroom advice, product questions, or anything in between.

Chat icon
Chat with us

Need quick advice? Start a live chat and we’ll guide you through.

Start chat
Email icon
Send us an email

Prefer email? Drop us a message and we’ll get back to you soon.

Send email
More from Bath Lab
Bathroom furniture swatches from BathLab.co.uk
Bathroom Furniture Samples (Free)
£0.00
Sale
Lux Overflow Bath Filler With Built In Control Valve & Waste - Chrome
Sale price £119.99 Regular price £160.12
Sale
90mm Fast Flow Shower Tray Waste - White & Brushed Brass
Sale price £22.99 Regular price £44.00
Sale
90mm Fast Flow Shower Tray Waste - Black
Sale price £22.99 Regular price £44.00
Recently viewed

Your Bathroom, Your Way

Hi, we're BathLab, and we're passionate about helping you create the bathroom of your dreams. With quality products and beautiful designs at affordable prices, we believe everyone deserves a space that's truly your bathroom, your way.

Buying a bathroom can feel complicated and scary - that's why we're on a mission to make things as easy as possible for you. We understand that bathroom jargon isn't for everybody, so we use easy-to-understand language and remove the stress from your bathroom journey. Let's make it a joy!

Free Furniture Samples

See how your new vanity unit will look in your bathroom with our free samples service

Order Your Samples
Easy-to-Buy Bundles

We've handpicked these bundles with everything needed - you just add the water!

Explore Product Bundles