Description
For those who want the best of both worlds, the Square Shower Bath delivers the perfect balance of practicality and style. With its spacious bathing area and generous showering space, this bath is ideal for modern homes where flexibility is key. The straight, square-edged design offers a contemporary look while maximising space, making it an excellent choice for compact bathrooms or those wanting a streamlined, minimalist aesthetic.
Crafted from high-quality acrylic, this bath is designed for durability, comfort, and excellent heat retention. Available in four sizes (1500mm, 1600mm, 1700mm, and 1800mm, all 850mm wide), it caters to a range of bathroom layouts. The left- or right-hand options ensure a perfect fit for your space and as it is the bath only, it allows you to customise with your preferred bath screen and panel to suit your style.
- Space-saving shower-bath combo – Ideal for bathrooms where both bathing and showering are needed without compromising on style.
- Modern square-edged design – Clean lines and a sleek finish for a contemporary aesthetic.
- Durable acrylic construction – Strong, long-lasting, and designed to retain heat for a more relaxing soak.
- Flexible sizing – Available in four lengths to suit different bathroom layouts, with left- or right-hand configurations.
- Customisable setup – Bath-only option lets you choose your ideal shower screen and panel for a tailored look.
Whether you're creating a stylish family bathroom or upgrading a guest ensuite, the Square Shower Bath is a versatile, modern solution that offers both comfort and functionality.
Specification
| Product code | WBS1785L |
|---|---|
| Brand | Bath Lab |
| Style | Contemporary |
| Material | Acrylic |
| Colour | White |
|---|---|
| Length | 1695.0 mm |
| Width | 855.0 mm |
| Depth | mm |
| Height | 400.0 mm |
| Weight | 24.0 kg |
| Entrance Width | mm |
| Door Swing In | mm |
| Door Swing Out | mm |
| Radius | mm |
| Number Of Tap Holes | 0 |
| Inner Bowl Height | mm |
| Maximum Radiator Projection | mm |
| Volume | 235.0 l |
| Displaced Capacity | 165.0 l |
| Bowl Shape | |
| BTU at 30 Degrees Celsius | BTU |
| BTU at 50 Degrees Celsius | BTU |
| BTU at 60 Degrees Celsius | BTU |
| Heating Element Wattage | W |
| Number of Bowls | |
| Seat Type | |
| Tap Holes Required | |
| Adjustment | |
| Guarantee | 5 Years |
| Waste Included | No |
| Legs Included | Yes |
| Bath Panel Included | No |
Free delivery on orders over £299
This product is classed as a large delivery item and the following delivery options are available:
| Delivery Service | Timescale | Cost |
| Delivery ASAP | Usually delivered in 1-2 working days | £29 (free if order over £299) |
| Delivery When You Are Ready | We will email you to arrange a delivery date with you | £29 (free if order over £299) |
If your order consists of large and small products, you will only pay the large item delivery fee
When will delivery be?
Deliveries are Monday - Friday between 8am - 6pm. and you will kept updated on delivery by email, phone or text so you know when delivery will be.
Can I delay delivery?
Yes, please place you order and email us the order number and details of when you would like delivery to be.
Can I order something that is out of stock?
Yes, you can back-order an item to be delivered once available. If you order other in-stock items we will delay delivery until all items are available but can arrange a split delivery if required (which may incur charges).
Can I change my order once placed?
Yes, provided your order has not been dispatched, it can be changed.
Where do you deliver to?
We deliver to the majority of mainland UK. We do not deliver to Ireland, Northern Ireland, the Scottish Isles & Highlands or the Channel Isles at present.
See our delivery page for more information
- We offer a no-quibble 30 day returns policy (from delivery) for refunds and exchanges.
- We also offer a convenient collection service for unwanted products. This is chargeable but is useful for large, fragile items.
- To arrange a return, please contact us first to start the process.
- We cannot accept returns for products that have been used, installed or are not as new.
- In the unlikely event that an item arrives damaged, we will arrange a replacement or refund.
- Damaged items must be reported to us within 48 hours of delivery.
See our returns page for more information
Still have questions?
We're here to help with bathroom advice, product questions, or anything in between.
Your Bathroom, Your Way
Hi, we're BathLab, and we're passionate about helping you create the bathroom of your dreams. With quality products and beautiful designs at affordable prices, we believe everyone deserves a space that's truly your bathroom, your way.
Buying a bathroom can feel complicated and scary - that's why we're on a mission to make things as easy as possible for you. We understand that bathroom jargon isn't for everybody, so we use easy-to-understand language and remove the stress from your bathroom journey. Let's make it a joy!
See how your new vanity unit will look in your bathroom with our free samples service
We've handpicked these bundles with everything needed - you just add the water!
